April 25 Tioga and Glacier Point Road Snow Plowing Progress

In Uncategorized

The snow is still really deep but plowing is progressing. Still no projected opening date.

NPS:
Tioga Road
Starting: 6.8 miles from Crane Flat (at South Fork Bridge)
Ending: 7.1 miles from Crane Flat
Distance plowed: .3 miles
Snow depth: 8 feet

Glacier Point Road
Starting .9 miles from Badger
Ending: 1.4 miles from Badger
Total distance plowed today: .5 miles
Snow depth: 10 feet

You may also read!

Highway 41 Closed Temporarily

If you're coming from Fresno and headed to Yosemite Valley or if you're staying at the Tenaya Lodge or

Read More...

Glacier Point Road Closing Thursday

Be sure to check road conditions before you travel as some roads in and into Yosemite may be affected

Read More...

Winter Storm Could Bring Heavy Rain and Snow this Weekend

A winter storm is moving into the area and could bring up to 4 inches of rain in the

Read More...

Mobile Sliding Menu